September
25, 2007
SRG reviewed the activity of in-service with faculty, staff,
students and Board members on September 21, 2007. As a part
of activities, teams were provided with the square footage
available on the Jerome Avenue campus and squares sized to
programmatic needs. Their task was to fit the programmatic
squares into the existing square footage. Some themes that
emerged are included.
Download: inservice.pdf (336K)
During
the next part of their presentation, the architects provided
slides about the campus. The first section shows
an overview of the campus, geotechnical information,
and accessibility
of the campus.
Download: campus
overview.pdf (2MB)
The
next part of the presentation focused on the north part of
the campus including Towler, Patriot, and the
Library.
Download: North
campus.pdf (1.1
MB)
The
last part of the presentation focused on the south part of
the campus including Fertig, the Art building,
Student
Services Center, Health Sciences, and the Tin Building.
Download: South campus.pdf (1.2
MB)
The next meeting is scheduled for October 18, 2007 from
4 to 5. The architects will be presenting design concepts.
In
order to view these documents (.PDF) you must have the
free Adobe
Acrobat Reader software installed on your computer.
|